High Heat Test - February 1999
The four -39's maintained the shelter temperature in the mid 70's ... as the chamber temperature was increased to 125 degrees F.

Extreme Cold Testing - May 1999
The basic system satisfied all requirements as the temperature of the climatic laboratory decreased from ambient of 80 degrees F to negative 55 degrees F.


Holloman Air Force Base - June 1999
Qualification Operational Test and Evaluation

Test Performed:
Operate and Maintain for 30 Days
Verify Airlift Requirements (C130 and C-141B)
Document System RMA
20 Assemblies/Disassemblies
Shelter Assembly on Soft Surface
Assembled in MOPP-2 and Cold Weather Gear

Real World Operations:
Welding and Power Production
Arc/Gas/TIG Welding
Generator Maintenance
Vehicle Maintenance and AGE
Humvee Maintenance
13K Forklift Maintenance
AGE Inspection
AGE Maintenance
Shelter Assembly on Concrete
Entry/Exit of P-19 Fire Vehicle
50 Hertz Test
Operating on Generator Power
Utilities Interface
AM-2 Matting Used for Flooring
Visual Blackout Test
Food Preparation Areas
Medical Requirements


United States Army Aberdeen Test Center
United States Air Force Critical Performance Demonstration/Test - November 1998

Rain Test - CAMSS Passed all Standards
The wind/rain simulator will be set to simulate a 40 mph wind/rain. One end wall and one side wall of each shelter system will be exposed to the simulated wind for 30 minutes per wall. Free falling rain will be applied to the shelter at the rate of 5 inches per hour to determine if its design will prevent water accumulation on the roof surface.

Wind Test - CAMSS Passed all Standards
The shelter will be exposed to wind at speeds of 65 mph for 30 minutes per side. (MIL-STD-810E, Method 506.2, Procedure III)